This year has been a year of working on home improvement projects that have fallen behind. It feels so good to finally be accomplishing a few goals from previous years that we hadn’t gotten to yet.
House Roof
Two years ago we had a bad ice dam over Fiona’s room which caused damage to the outside wall of her room. Our homeowners insurance covered the repairs to the room but not the roof. The construction company that fixed the room told us we needed a new roof.

At the time that was not possible, so every time it snowed Trenton would head up there and shovel the roof off so we didn’t have another ice dam. In northern Wisconsin we get a lot of snow so he would climb the ladder about once a week to shovel. Last year he slipped on an icy spot and almost slipped off the roof. I had to shimmy up there to toss him a rope which I looped off the chimney so he could get off the ice he was on without sliding off the roof. We decided that this year the roof was getting done.
Thankfully interest rates are low right now and we were able to refinance with a lower interest rate. Since we were switching over from shingles to tin we decided that we could do a roof over. The construction company framed over the roof and we also had them build eves over the sections that did not have any overhang previously. The tin came in and they started laying it out while the kids watched their every move. They were completely fascinated by the work going on. It took them about two weeks to finish the roof but it looks great! As a bonus they vented out the attic better so it is now actually usable space. We have been reorganizing the house and I look forward to my new attic office space, the girls will be moving in together soon, and Lucian will have his own room.
Bathroom

We have been remodeling our bathroom for two years now! I finally made an executive decision to have the same construction company work on our bathroom. Trenton is very handy but we both discovered that bathroom work is over our head. The crew came in and put the sub flooring in, laid vinyl, refitted the toilet, installed the tub and shower surround, put drywall in, taped and mudded, and hung the new door. They also shimmied into the crawl space to find out how the exhaust fan above the shower was vented. Apparently it was vented into the attic space above our room which is very bad. They cut a whole into the roof so they could vent it out properly. That leaves us with paint, putting up wainscoting, and trim. Skills we can handle. We have been sanding and coating poly on trim for the last few days. The walls are primed and painted. It is inching closer to being done and I am so excited to see the room finally progressing.
Barn Roof

Finally!! We have had the tin for this project for four years now. I asked my cousin Jake to come out and help Trenton put the tin on the roof labor day weekend but that didn’t quiet work out. Jake went to help a stray cat out of the road and it sank it’s teeth into his right hand. Cat bites are worse than dog bites and his hand swelled up and turned red. He needed a few weeks healing time which gave Trenton time to put roof jacks up, get ladders set and get all the materials ready to go. Jake came out Friday afternoon and Aunt Candy watched the girls while Lucian and I were at school so they could get it done. Only the top tier of the barn needed to be done so they were able to finish it by dinner time. It was very high up and the new tin was pretty slippery so I am thankful for a cousin who will help out with big projects for the price of fish fry and a few pumpkins.

This year has been great for wrapping up big projects that needed to get done. I’m looking forward to the next big rain so I can watch rain slide off the roofs instead of through them!
Now it’s time to work on pumpkins for the fall!